Polymer Concrete Cell
How? PRS-patented FRP rib reinforcement:
• Increases load capacity by 200% vs standard cells.
• Reduces wall thickness by 15%, saving material costs.
Permanently Corrosion-Proof & 30% Lighter: The FRP-Reinforced Polymer Concrete Cell for Zero-Maintenance Copper Electrowinning.

Core Advantages
Unmatched Structural Strength
How? PRS-patented FRP rib reinforcement:
• Increases load capacity by 200% vs standard cells.
• Reduces wall thickness by 15%, saving material costs.
Physical Specifications (Per Factory Certification)
|
Parameter |
Value |
|
Compressive Strength |
≥ 80.0 MPa |
|
Flexural Strength |
≥ 22.0 MPa |
|
Flexural Modulus of Elasticity |
≥ 22.0 GPa |
|
Volume Resistivity |
≥ 3.0 × 10¹² Ω·cm |
|
Thermal Conductivity |
1.0 ~ 2.0 W/(m·K) |
|
Coefficient of Linear Expansion |
≤ 20 × 10⁻⁶ m/m/°C |
|
Density |
≥ 2.2 × 10³ kg/m³ |
Zero Maintenance for 30+ Years
Why It Lasts
Material: Vinyl ester resin + quartz sand (ASTM C581 compliant).
Self-Repairable: Patch cracks in 6–12 hours.
Lifespan: Permanent in pH 0.5–2 electrolytes (tested since 1998).
Customization for Extreme Conditions
Acid Mist Hood: Prevents freezing in sub-zero climates (-30°C).
Liquid Distribution: Configurable inlet/outlet pipes (PP/CPVC/PVDF).
Size Range: 2m–6m L × 1m–1.8m W × 1.5m–2.2m D.
Seismic Safety: We have extensive experience in anti-seismic cell design. For example, the integration of anti-seismic blocks ensures zero displacement along the X and Y axes during earthquakes. We also provide engineering suggestions such as replacing individual base columns with integrated concrete walls for added foundation stability.

Project Case: Real-World Proof
PRS delivered a full set of electrowinning cells with customized FRP reinforcements and acid mist hoods. The installation was seamless, and performance exceeded expectations.



Result: Zero cell replacement, maintenance cost reduced by 90%.
Procurement Made Easy
|
Stage |
PRS Advantage |
|
Design |
Free AutoCAD drawings + engineering review |
|
Lead Time |
90 days for 50 units |
|
Payment |
50% TT deposit, balance before shipment. Bank guarantee available |
|
Support |
24h remote/on-site commissioning |

Smart Packaging & Logistics

1
Shock-Proof Frame
Steel frame packaging withstands 3G impacts (tested per ISTA 3A).This can effectively prevent the occurrence of cargo damage that may be caused by violent loading and unloading at some ports.
2
Cost-Saving Consolidation
We use container shipping. To optimize space and reduce costs, related products such as cathode plates, anode plates, and grating, etc., they can be loaded directly into the cells. Based on your project location, we can arrange sea, road, or rail transportation accordingly.
Technical FAQ
Why Choose PRS?
Proven
600+ cells operating in 18 countries.
Fast ROI
2-year payback via zero maintenance.
End-to-End
From drawings to seismic kits – one supplier.
Hot Tags: polymer concrete cell, China polymer concrete cell suppliers, 10mm insulation board, 120mm celotex, Capping Board, Cell Furniture, electrowinning cell, Electrowinning Cell Insulating Board
Previous
No InformationNext
Cell BusbarYou Might Also Like
Send Inquiry


















