Our Vision
To become your most trusted global EPC partner in copper metallurgy - offering turnkey solutions that empower you to build efficiently, operate reliably, and grow sustainably.
Your goals drive our innovation. Let's build something exceptional together.

1. Vision for Scalable Copper Production
At PRS, we believe that every copper producer - whether operating a 100TPM modular plant or a 100,000TPA industrial facility - deserves the same level of engineering precision, service, and long-term profitability.
Our vision is to make modern copper electrowinning (EW) accessible, scalable, and efficient for all mining operations worldwide.
Through modular design, digital process control, and smart EPC integration, PRS helps clients build plants that grow with their business.
2. Speed, Efficiency, and ROI
Time and investment define success in mining projects.
PRS focuses on delivering complete SX-EW plants within 8–12 months, helping clients start production faster and achieve high ROI from the very first year.
Our EPC workflow combines:
- Optimized engineering design for faster construction
- In-house equipment manufacturing to ensure quality and consistency
- Modular installation approach reducing on-site time and cost
- Energy-efficient systems lowering operational expenses
Whether it's a 100TPM pilot plant or a 100,000TPA expansion project, PRS ensures every client gets a system that is profitable, reliable, and future-ready.
3. Driving Global Copper Sustainability
We are committed to supporting the global transition to cleaner, more sustainable copper production.
From design to commissioning, every PRS project aims to:
- Reduce energy consumption
- Optimize water and acid recycling
- Minimize emissions through advanced mist control and scrubber systems
Our mission is simple: to make copper production cleaner, smarter, and more efficient - one project at a time.
4. The PRS Promise
✅ Customized Design: Tailored for your ore grade, capacity, and climate
✅ Turnkey EPC Service: From engineering to commissioning
✅ Fast Setup: 8–12 months from design to operation
✅ High ROI: Reliable output, low maintenance, long lifespan
From 100TPM to 100,000TPA - PRS delivers scalable, high-ROI copper SX-EW solutions that power the world's transition to sustainable mining.

